Saturday, May 13, 2023

Refurbishing the unfinished train layout.

 About 30-35 years ago, Dick Miller started an N gauge model railroad.  Built on a 32" hollow core door, it was complete: buildings, track, switches, wiring for lights, power, etc.  It even ran, but, it had no scenery.  There were most of the components to do so but it was never finished.

First step of many, deconstruct the track layout.  In traditional anal-retentive style, if the track had a nail hole, there was a nail.


Finally, a track inventory- plus lots of other track that was not on the layout.

Building inventory


Rolling stock



The rebuild and refurbishment begins.  First up, a base layer of foam board.  This does a couple of things including being able to add negative relief scenery without digging into the wood and make the layout run nice and quiet.


Sketching layouts with terrain 

Waiting for glue to dry


Glue dried
 

Time to start sculpting

Work on the right side starts

the back board is just for forming against

all blocked in.   sculpting to commence
Left side sculpting continues.   lots of smoothing to do here.
More smoothing
Let mix dry after doing some bulk carving before it set up
Applying the plaster mix to the mountains
Throwing some paint onto the mountains
Tunnel portal
Work around the pond.  The colors should give the feeling of depth and undergrowth.  Landscaping will get done prior to the pouring of the "water".
More mountain work.
Church on its hill.
Various scenery ready for paint- all but the church and portal are 3D printed
For the tank farm.
Pond and creek view from the rear
More painting


Ready for tracks- the colors will change the way the landscaping looks once the ballast, dirt, grass and surface materials are in place.   It should provide depth of field.
Fitting the main line through the portal. [for future use, possible extension point]
Cementing the bigger bridges into place [note the spray bottle holding the little girder bridge down on it's moorings]
A week or so passes, fiddling with a whole bunch of items from the 3D printer that may or may not wind up here.  FYI, all the bridges are 3D printed.  Most of the buildings were existing stock from the original layout.  
Back to the pond trolley.  Dry fitting the track to get the curves,
Trolley roadbed; "let glue dry"-the great builder Laura Kampf

Laying some tracks
Test Run

Flying by
Existing street cars- they do not like 8" radius turns

Track rough in on mountains
Ballasting the loop
Railbed to the right
Ground cover around the pond
Filling the pond; adding ground more cover
Ground cover complete and pond spilling over the dam.  Let glue dry.
More roadbed.  That's white paintable latex caulk since I couldn't find gray at a reasonable price.  grrrr.
Just a little bit more road bed to lay.





Monday, December 5, 2022

US-17: the final leg

 

After a one year delay, US-17 will be completed.  The first of our end-to-end series.  Our month at Jekyll Island concluded, we head southwestish towards Orlando, avoiding the interstates as much as possible.  Friday, December 2, we headed to the Winter Haven Howard Johnsons where last year's dog attack took place pausing just long enough to reset the trip odometer.  We have no desire to stay here ever again; Taffee is fine.   She shook it off like the little champ she is, but this place just has some bad mojo.

Hurricane Ian ravaged this final stretch of 17 to Punta Gorda.  And as before, getting this final piece of 17 completed became a chore with the local Winter Festival blocking all of the major East-West streets in the center corridor of the city.  







Blue tarps are a common sight along the way.  Even some church roofs were entirely cloaked in tarps.



We snuck down an alley to finally get to US-17's southern terminus.

And with that one year delay, our first end-to-end is complete.  
What's next?





Tuesday, November 1, 2022

Here we are

We are ready for the off to Jekyll Island for our vacation.  Yes, we're both retired.    H O W E V E R, this past 8 months have been a near whirlwind of chaos.   First, we decided to try to sell our home of 33 years in Baltimore.  Our fears were we would have missed the housing bubble AND that it would sit on the market for an extended period due to its age as well as the fact it is in Baltimore.   Thankfully, our listing agent made it all so simple sounding with the hard part getting the pre-sales work completed before listing.   He was right; lots of work got done- stuff we had been putting off for years. 

Jean had shoulder replacement surgery scheduled for late June/ early July and the expected 'to sell' date was approximately 6 weeks after we listed, based on the market at that time we were not concerned about any overlaps; the house sold in 2 days.  TWO DAYS.  Well, that just made our lives more interesting.  We asked the buyer to rent back the house until Jean was fully ambulatory in late July which they had no problem doing.  Then, after all the pre-sales work we did clearing out and paring down, the rest had to be packed by a two people with three good arms.

The move to The Estate was to relatively painless with professionals handing the big pieces of furniture for the final move out day.  Now, we had planned on building a modular or stick built house on the property of The Estate; even had a building site selected.  Between the time delay to build AND the costs [which were for all intents and purposes, the same] we decided to look at the existing housing nearby with three stipulations: no more than 20 minutes from The Estate [to act as a guest house]; roughly 1500 sf rancher/rambler; 'move-in' ready; and, less than building new with the 'all-in' costs figured.  We gave ourselves 2 weeks to figure this out and commit one way or the other.

A couple of viewing later we recruited a local buyers' agent to aid the process.  And she was a gem.  Seriously, if you are in the market in the Cumberland-Romney-Keyser tri-cities area, talk with Taylor Kiggens- she is the best.  She sent us a prelisting for a house just down the road from The Estate- literally just down the road, three miles, no turns.  A lovely 1500 sf brick rancher built in the late 1960's for sale by the estate of the original owners who had the house built.   It sits on about an acre and a quarter just off Patterson Creek with lots of recent improvements [metal roof, newish heat pump, etc].  So we put an off in and poof- it was ours.  So now we get to hire contractors to do some painting and flooring



, maybe change our the dated kitchen counter; a collection of little things but nothing that would prevent move-in on closing day if we wanted to.  Sadly, all the local contractors are busy so the earliest anyone could get in to do the stuff was January; we decided to tackle the stuff we could ourselves and farm out the complex things- counter, carpet cleaning, some plumbing updates, etc.  


Before we left for our annual Jekyll getaway, the kitchen, main bedroom and sewing room were done-done with the basement and tractor shed as done as they're gonna get for now, AND we have a  new backyard gazebo to screen in over the winter.  The living room and guest room/office is next up on our return, but for now, we vacation.